Sign In | Join Free | My howtoaddlikebutton.com |
|
Categories | Mud Pump Fluid End |
---|---|
Place of Origin: | China |
Brand Name: | YINDA |
Certification: | API 7K |
Model Number: | Triplex Mud Pump |
MOQ: | 1 |
Price: | USD/CNY |
Packaging Details: | Plywood case / Iron plate |
Delivery Time: | In stock |
Payment Terms: | T/T 30%DP, Balance before delivery |
Supply Ability: | In stock |
Usage: | drill rig |
Application: | Conveying mud and flushing fluids |
Structure: | Piston Pump |
Standard or nonstandard: | Standard |
Type: | Mud Pump |
Product name: | Mud Pump |
Oem: | Applicable |
Condition: | new |
Plug Assembly, Mud Pump Fluid End AH36001-05.22 AH1301010518 mud pumps for drilling rigs
Plug Assembly was used in Mud Pump Fluid End.Material: American ASTM A48-83 modified cast iron; Use for F series, PZ series and 3NB series mud pump; API standard; Different model.
Details of mud pump plug board assembly(flash board assembly):
Flash board with copperblocks belongs to mud pump parts.
Preventing the valve box won't bedamaged.
Copper block is changable.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 | |
HRSB | RSF-1300 | RSF-1600 | ||||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 | ||||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L | ||||
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 | ||||
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 | |
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT | ||||
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 | |
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 | |||
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place
order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the
most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we
issue you an PI for your confirmation. You will be requested to do
pr-e paid full payment or deposit before we go into production.
After we get the deposit, we start to process the order. We usually
need 15-25 days if we don't have the items in stock. Before
production has been finished, we will contact you for shipment
details, and the balance payment. After payment has been settled,
we start to prepare the shipment for you.
4) How do you take care when your clients received defective
products?
A: replacement. If there are some defective items, we usually
credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We
check the goods when they go into next step production procedure.
More customer view:53-EmscoFC-1600-yindapump.com.pdf
![]() |